UP 3911 forwards pile driver SPMW8003 and its little train of support cars through the Antelope Valley at Oban, CA on January 17, 2005. The pile driver is being taken to the Coast Line to work on wash outs between Santa Barabra and San Luis Obispo.
Date: 2005-01-17
Copyright 2020 by Ron Lehmer