January 17, 2002 finds a QRVML tip-toeing along the Coast Line at East Garrison. The piles of new ties are an indication of the work ahead. In the mean time, freights are limited to 25MPH and passenger trains 30MPH between San Lucas and Paso Robles.
Date: 2002-01-17
Copyright 2020 by Ron Lehmer